10%20Ayr%20Street%20-%20Website%20Image_

Pump Station - Prestons

2015

This unassuming concrete structure protects a valuable council asset, and while the aesthetic of the architecture is limited, the requirements was to be fit for purpose. Industrial projects require a large consultant team, and AP Design provides an integral role within this team time and time again.

Since this project was completed in 2015, AP Design have been involved with infrastructure projects throughout New Zealand, and have worked with many groups of skilled professionals while delivering on our core value for dependability.

1/2

Quick links

© AP Design Ltd Est. 2005 | All Rights Reserved
admin@apdesign.co.nz
 128 Montreal St | Christchurch | New Zealand Privacy Policy
LBP Logo white.png
NZGBC white-logo.png